Skip to Content

Parton Emergency
Landslide Repair
– Phase 1 & 2

Rail

M540, M545

Cumbria, England

In response to multiple embankment failures along the West Coast Mainline near Brandon, SG Elite was brought in by J Murphy & Sons to stabilise four critical sections spanning 180 metres. Our rapid deployment and expert execution were essential to restoring safety along this high-speed rail corridor.

Operating under our Any Line Open (ALO) Safe System of Work, we completed most of the project outside of possession periods—keeping rail operations running at full speed. Working on steep 30-degree gradients and a 22-meter-high embankment during harsh winter conditions, our team handled large-scale de-vegetation, excavation, and reprofiling with precision.

Using a Seve MFM-125 mulcher, we safely cleared vegetation at scale, drastically reducing manual labour and expediting progress. Our Menzi M545—tethered for safety—navigated the unstable slopes, enabling accurate material handling and excavation. Materials were transferred efficiently using long-reach excavators positioned at the top of the embankment.

We also installed drainage systems, permanent legato walls, and engineered precise step formations for long-term embankment stability.

Working alongside J Murphy & Sons and Network Rail, SG Elite delivered a fast, safe, and sustainable solution—restoring a key section of infrastructure and safeguarding passenger services along the West Coast Mainline.

Default Graphic (Left) for SG Elite Default Graphic (Right) for SG Elite

Services Used

Trained For All Terrains

Contact Us