SG Elite was commissioned to remove 440 linear metres of reinforced concrete slabs from the riverbed at Lomeshaye, Nelson. The client required a fast, environmentally sensitive solution that would reduce programme time while protecting the surrounding ecosystem.
Faced with river depths of over 1.5 metres, embedded steel reinforcement, and protruding steel bars, SG Elite delivered a tailored solution that avoided the need for disruptive cofferdam installations. Using our Menzi M545 excavator paired with a heavy-duty Rocksaw, we cut and removed concrete slabs ranging from 200mm to 500mm thick and up to 5 metres wide—all within 5 days from mobilisation.
To ensure eco-friendly operations, we used fully bio-degradable fuels and oils, drip trays, and double bunded equipment. Our Menzi operator safely removed steel bars embedded in the riverbed, reducing future hazards to wildlife and the public.
Dust suppression was managed through continuous water spray during cutting, keeping environmental disruption to a minimum.
By avoiding traditional demolition techniques and temporary works, SG Elite significantly reduced cost, time, and environmental impact. This project showcases our commitment to sustainable construction, safety, and innovation in challenging environments—delivering exceptional results while protecting the natural surroundings.