SG Elite assisted Nexans in connecting the Seagreen Offshore Wind Farm to the Scottish National Grid. This 1,075 MW wind farm, 27 km off the Angus Coast, with 114 MHI Vestas 10MW turbines. Our role involved the installation of three 272-meter SESU pipes to connect with the landfall pipes adjacent to Carnoustie Golf Links.
We faced several challenges, including working in water and intertidal zones, as well as a limited time window for pipe installation. Additionally, unstable ground conditions posed further challenges, which we successfully overcame with our specialist equipment and skilled team.
Our team provided a range of essential services, including uncovering landfall pipes for connection to spool pieces, intertidal excavation to facilitate the installation of spool pieces, and assisting in the trenching operation for the SESU pipe installation. All equipment ran with bio-degradable fuels and oils, ensuring no risk of environmental contamination.
Working within tight tidal windows, our skilled operators uncovered buried pipes and assisted with each spool piece connection. The project was completed on schedule, contributing to a more sustainable energy future.