Skip to Content

Ground Investigations & King Post Installation
– Cullbackey

Rail

Walking Excavator

Cullbackey, Northern Ireland

To support essential S&T infrastructure upgrades for Translink, SG Elite was engaged by Babcock to deliver rapid ground investigations and enabling works in Cullbackey. Operating under a critical blockade schedule, our team mobilised quickly to meet demanding program milestones.

Working Any Line Open (ALO) alongside an operational railway, SG Elite delivered all works with no disruption to train services or passenger operations. Our scope included rail-side ground investigations across multiple locations, followed by the deployment of a down-the-hole (DTH) hammer system to drill through fractured rock, where conventional methods were ineffective.

We installed three king post retaining walls to support the construction of LOC stations. All works were completed using a walking excavator fitted with specialist DTH attachments, providing safe, precise access in restricted and geotechnically challenging conditions.

SG Elite’s proven ALO methodologies, experienced team, and advanced machinery enabled seamless project delivery—supporting Babcock and Translink in meeting critical infrastructure upgrade deadlines without impacting rail operations.

Default Graphic (Left) for SG Elite Default Graphic (Right) for SG Elite

Services Used

Trained For All Terrains

Contact Us