Multiple major landslips along the West Coast Mainline in the Brandon area required an urgent response. J Murphy & Sons installed temporary retaining walls at critical failure points and engaged SG Elite to support the emergency works across four sections, totalling 180 metres.

Working alongside a 125mph live railway line using our Any Line Open (ALO) system, SG Elite was able to operate outside of possession periods, accelerating delivery and reducing disruption. Our scope included large-scale de-vegetation, reprofiling, and drainage installation across a steep 30-degree, 22-metre-high embankment, all during traffic hours.

Using our tethered Menzi M545 excavator and a Seve MFM-125 mulcher, we safely cleared vegetation and efficiently moved material between embankment levels. A robust restraint system ensured safe operation on steep gradients. We facilitated the transport and placement of 6G backfill material, assisting in the construction of a permanent legato wall and achieving precise step formations to ensure long-term slope stability.

SG Elite’s rapid mobilisation, technical expertise, and ability to work ALO helped Murphy stabilise this critical section of railway infrastructure quickly and safely—enhancing the reliability of the West Coast Mainline while minimising impact on local communities.

Default Graphic (Left) for SG Elite Default Graphic (Right) for SG Elite

Services Used

Trained For All Terrains

Contact Us