SG Elite successfully delivered a major infrastructure project along the Lurgan to Portadown railway line in Northern Ireland, installing over 1.1km of King Post Wall and Cubis troughing adjacent to the operational railway. This work was part of a wider S&T upgrade programme.The retaining wall system consisted of a combination of 8.8m and 4.5m king posts and concrete panelling, installed using a highly efficient walking excavator and vibro piling solution. This method significantly reduced installation time and project costs, while maintaining the highest standards of safety and quality.SG Elite managed all on track plant operations throughout. Additionally, we developed a bespoke secondary engine system for the Menzi, enabling safe and efficient emergency recovery in the unlikely event of failure.This project demonstrates SG Elite’s commitment to innovation, safety, and delivering smart, cost-effective solutions for critical rail infrastructure.