Rail
Walking Excavator
Cullbackey
Ground Investigations & King Post Installation – Cullbackey
Time-critical enabling works for Translink’s S&T upgrade, delivered ALO. SG Elite completed specialist ground investigations, DTH drilling, and king post wall installation alongside a live railway.
Environmental
M545
Newry
Eco-Friendly Mulching at Killeavy
Working in Killeavy’s steep terrain to mulch trees, avoiding environmentally harmful access roads. This efficient, safe, sustainable approach saved time, reduced costs.
Energy
M540
M545
Scotland
Seagreen Offshore Wind Farm Connection
SG Elite supported Nexans in connecting the Seagreen Offshore Wind Farm to the Scottish National Grid, for intertidal excavation, pipe installation, and ensuring environmentally safe and efficient operations.
Rail
M540
M545
England
Restricted Access Rocksaw
SG Elite’s skilled operators assisted BAM at Stalybridge using a walking excavator and Rocksaw, allowing realignment of the track for a new platform. The solution reduced setup time and ensured minimal disruption.
Rail
M540
M5445
Portadown
King Post Wall Installation
SG Elite installed 1.1km of King Post Wall and troughing using walking excavators, delivering cost-effective vibro piling solutions and engineering innovations to enhance safety, speed, and reliability on the Lurgan–Portadown line.
Rail
M540
M545
England
ALO Vegetation Management
Emergency embankment stabilisation on the West Coast Mainline, delivering rapid, safe ALO works. SG Elite provided rapid vegetation clearance, earthworks, and precise profiling to restore stability and safeguard high-speed rail operations.
Marine
M540
M545
England
River Demolition – Lomeshaye
Rapid removed 440m of reinforced concrete from a live riverbed using walking excavator M545 and bio-friendly methods—delivering a fast, sustainable solution with minimal environmental impact.
Highways
M220
M540
M545
England
Highways Environmental Barrier Installation
Delivered sustainable foundation works for an environmental barrier along the M1 using walking excavators, overcoming restricted access and complex terrain while reducing excavation, material waste, and environmental impact.
Rail
M540
M545
England
Railway Ground Stabilisation – Gailey
Regraded 1.2 miles of cutting along the West Coast Mainline, ensuring stability and safety using ALO methods, advanced machinery, and efficient excavation, while minimising disruption and earning Network Rail’s safety award.
Rail
M540
M545
England
ALO Ground Investigations
Performed geotechnical investigations at Brandon Cutting, using bespoke modular drilling platforms to collect high-quality samples and install inclinometer casings—delivering essential data safely and efficiently without disrupting live railway operations.
Rail
M540
M545
England
Parton Emergency Landslide Repair – Phase 1 & 2
Stabilised 180m of failed embankments on the West Coast Mainline using ALO methods, rapid mulching, and tethered machinery—delivering emergency works safely, efficiently, and without disrupting high-speed rail services.
Mining
M540
M545
England
Bardon Hill Quarry – Demolition
Delivered critical enabling works for 800m suspended conveyor at Bardon Hill Quarry—overcoming steep slopes, hard rock, and winter conditions with tethered Menzis, 24/7 operations, and zero disruption to quarry output.
Rail
M540
M545
England
Hammer Embankment Retention & Drainage
Stabilised steep embankment between live railway and river using ALO methods—installed retention wall, soil nails, and drainage—delivered safely with major time, cost, and carbon savings, without disrupting rail services.
Rail
M540
M545
England
Dinmore tunnel – ALO Drainage
Installed 30 counterfort drains on 45° slopes above a live railway, resolving critical drainage issues safely and efficiently using ALO methods – saving time, cost, and preventing service disruption.
Rail
M220
M545
England
Umbourne Cutting Retention and Drainage
SG Elite installed over 120m of King Post Walls and drainage above a live railway, resolving slope failure risks. Using ALO methodology, we delivered safely, efficiently, and without service disruption.
Rail
M220
Portadown
Parton Landscape Remediation Works
The world’s first guitar-shaped hotel, built in phases to reduce impact on existing operations. The world’s first guitar-shaped hotel, built in phases to reduce impact on existing operations.